PROJECT MANAGER:

Mitch Nissen

SUPERINTENDENT:

Paul Coldman

LOCATION:

Sioux Falls, SD

COMPLETION DATE:

August 2020

STI Vet Tech Addition & Renovation

Remodel and addition work within several buildings on the Southeast Tech. campus began in April 2020.  A new Vet Tech. program space was constructed on the east side of the Ed Wood Center.  A remodel of 2,500 sq. ft. and a new addition of approximately 4,500 sq. ft. included classrooms, clinical spaces, offices, storage, and animal housing spaces.  In addition, the Electrical Lab in the Ed Wood Center was remodeled to provide additional wood and metal stud work stations, new drinking fountains, lighting, and radiant heat.  In the Health Sciences building, an existing classroom was remodeled for the Dental Assisting program.  In the Hub building, a new aluminum storefront wall was constructed at the second floor to enclose open space.